Options:
|
Bonded
Building Permit(s)
Curb Cuts
Curb/Gutter
Drainfield Permit(s)
Engineer Drawings
Finished Lots
Master Plan
|
One Building Lot
Plat Approved
Plat Recorded
Preliminary Plan Review
Raw Land
Ready to Bond
Road Permits Required
Site Plan
|
Site Plan Approved
Site Plan Recorded
Utilities at Site
Utilities W/I 50'
Zoned
|
|
|